Vocus House
Brief: | 7 story office block comprising 2 levels of carpark and five levels of offices. | |||
Heatwave: | Brought late into the Project development, Heatwave were able to provide competitive, value driven solutions for the base build and tenancy requirements, including - 3D/revit drawing production, a 600kw chiller and a 400kw reverse cycle heat pump chiller, pumps, pipe reticulation, fan coils, Outdoor AHU, ventilation, BMS controls, electrical for mechanical and commissioning. |
|||
Details: |
|
Brought late into the Project development, Heatwave were able to provide competitive, value driven solutions for the base build and tenancy requirements, including - 3D/revit drawing production, a 600kw chiller and a 400kw reverse cycle heat pump chiller, pumps, pipe reticulation, fan coils, Outdoor AHU, ventilation, BMS controls, electrical for mechanical and commissioning.