Rutherford Hotel

Rutherford Hotel

Brief: The Hotel required increased capacity in its kitchen operations, without being invasive and shutting down.
Heatwave:

Not exactly nuclear science, but certainly some creative thinking was required to accommodate the aspirations of a leading NZ chef and restaurateur, for the expanded catering operations of the Hotel.

Working within strict existing physical limitations, Heatwave designed, fabricated, and installed systems that added a 30% increase in capacity to the catering operations.

This required the reconfiguration of existing exhausts, adding new hoods and fans, whilst maintaining operations throughout the build.

Details:
Main Contractor: Heatwave - Direct to Client
Brief:
The Hotel required increased capacity in its kitchen operations, without being invasive and shutting down.
Heatwave:

Not exactly nuclear science, but certainly some creative thinking was required to accommodate the aspirations of a leading NZ chef and restaurateur, for the expanded catering operations of the Hotel.

Working within strict existing physical limitations, Heatwave designed, fabricated, and installed systems that added a 30% increase in capacity to the catering operations.

This required the reconfiguration of existing exhausts, adding new hoods and fans, whilst maintaining operations throughout the build.

Details:
Main Contractor:
Heatwave - Direct to Client

Industry Alliance